


The Challenge
Shaw Education Trust identified an opportunity to enhance student and staff wellbeing by transforming underutilized wall spaces across their schools. The objective was to create visually engaging environments that reflected each school’s unique identity, with the critical requirement of zero disruption to the school day.
PLAN, PROCESS, PRODUCT

The process
Our collaboration was built on a foundation of consultation and careful planning. We developed bespoke design concepts, such as a calming Cannock Chase scene for a primary school, tailored to each site’s local identity. Using premium, durable materials, our certified installation teams executed the work during scheduled breaks and after hours, ensuring a seamless integration into the school calendar.
The end product
The project delivered a series of vibrant, professional feature walls that actively enhance the learning environment. The installations provide a lasting, visual connection to the local community, supporting the Trust’s commitment to creating inspiring and uplifting spaces for students and staff.
100% IN-house production
5 DAY LEADTIME


